مطار القاهرة الدولي. Cairo International Airport

It is the second busiest airport in Africa after in Map doesn't include Mwasalat Misr or CTA buses
Terminal Transfer [ ] The links Terminal 1, the AirMall, the multi-storey car park and Terminals 2 and 3 The airport is administered by the Egyptian Holding Company for Airports and Air Navigation, which controls the Cairo Airport Company, the Egyptian Airports Company, National Air Navigation Services and Aviation Information Technology, and the Cairo Airport Authority

مطار القاهره الدولى

Arrival Hall 2 was recently reopened and serves international and domestic arrivals.

3
ميناء القاهرة الجوي
Terminal 3 [ ] Given projected growth, and the limited ability to expand Terminal 2, the began construction of Terminal 3 in 2004
CAI القاهرة . فنادق بالقرب من Cairo
These are becoming increasingly scarce, as the government continues to replace old taxis with new ones
ازاى اروح مطار القاهره الدولى
from the original on 6 August 2011
from the original on 28 September 2018 Also, scheduling and route information of both the public CTA and MM buses are now readily available on and can be accessed using the app and website
After several project delays, the renovated terminal had its soft opening on 28 September 2016 with a capacity of 7 Cairo Duty-Free at Cairo Airport Terminal 2 Terminal 2 was inaugurated in 1986 with 7 boarding gates

مطار القاهرة الدولى

As of 2009 the facade of the terminal was being upgraded.

15
ميناء القاهرة الجوي
Eritrean Airlines - Gateway to Africa
ازاى اروح مطار القاهره الدولى
and new Category D are
خدمة VIP فى مطار القاهرة الدولي
The hotel is linked to the terminal by a 230-metre-long 750 ft skyway that is also equipped with a moving walkway